New masonry for the new Harry Rosen store in Toronto
Our team installed a limestone arch around each opening of the building, including the doors and windows. Each arch stone weighed between 800 and 1,000 pounds, and its lower portion, being particularly thin, was vulnerable to chipping. To move and put them in place, the team used winches and hoists attached to the scaffolding. Several masons had to hold each stone in position during the lifting and installation process, which required exceptional coordination.
Each stone was mechanically fastened to the structure with steel rods and anchors to provide a rigid, durable and secure hold. This fastening technique was essential given the weight of the stones positioned at a height. The fixing system ensured long-term stability for the entire arch. This was the most complex stage of the project, as it required placing each stone with high precision to form the arches.
We erected a rosette scaffolding system to carry out our work. This equipment adapts to the configuration of almost any building. Its spacious platforms facilitate movement and access to the cladding, making it the ideal choice for projects that require handling heavy loads. On this job site, these structures served as more than just a work platform: they were built higher to install winches and hoists, which were used to lift and position the stones on the wall. Their robust design ensured optimal stability for lifting.
Once the arches were installed and in accordance with the architect’s plans, our team laid thin brick all around them. The wall was then completed with a limestone coping that matches the arches. In addition, the old concrete plinth beneath the windows was replaced with a granite plinth. The result showcases the commercial building with remarkable and timeless elegance.
New masonry for the new Harry Rosen store in Toronto
Our team installed a limestone arch around each opening of the building, including the doors and windows. Each arch stone weighed between 800 and 1,000 pounds, and its lower portion, being particularly thin, was vulnerable to chipping. To move and put them in place, the team used winches and hoists attached to the scaffolding. Several masons had to hold each stone in position during the lifting and installation process, which required exceptional coordination.
Each stone was mechanically fastened to the structure with steel rods and anchors to provide a rigid, durable and secure hold. This fastening technique was essential given the weight of the stones positioned at a height. The fixing system ensured long-term stability for the entire arch. This was the most complex stage of the project, as it required placing each stone with high precision to form the arches.
We erected a rosette scaffolding system to carry out our work. This equipment adapts to the configuration of almost any building. Its spacious platforms facilitate movement and access to the cladding, making it the ideal choice for projects that require handling heavy loads. On this job site, these structures served as more than just a work platform: they were built higher to install winches and hoists, which were used to lift and position the stones on the wall. Their robust design ensured optimal stability for lifting.
Once the arches were installed and in accordance with the architect’s plans, our team laid thin brick all around them. The wall was then completed with a limestone coping that matches the arches. In addition, the old concrete plinth beneath the windows was replaced with a granite plinth. The result showcases the commercial building with remarkable and timeless elegance.
Unmatched Coordination
Behind every iconic storefront is exceptional craftsmanship
Join our Winning Team
We provide a rich, open, responsive, and close-knit work environment. As an employer, we foster strong team spirit and treat our people with respect and consideration.
News
Media Appearances
Community Involvement
News about our team, achievements, and community involvement. Our work stands the test of time, and we are constantly striving to become even better.
News
Media Appearances
Community Involvement
News about our team, achievements, and community involvement. Our work stands the test of time, and we are constantly striving to become even better.