Complete Replacement of the Concrete Cladding

We installed lightweight GFRC (Glass Fiber Reinforced Concrete) panels. Each one was securely attached to the structure using over 10,000 anchors drilled directly into the concrete. These anchors supported the vertical load and prevented any lateral movement.

To facilitate installation, we used a hoist specifically adapted to the constraints of the site. This custom system allowed us to safely lift the panels while the team coordinated their positioning with precision.

The team worked in full coordination, with the hoist lifting the panels from the ground and setting them precisely in their intended locations. Operators stationed on Fraco mast-climbing platforms monitored and guided the hoist throughout the operation. This method ensured a smooth workflow despite the complexity of the task.

We fully redid the caulking joints between the panels to ensure complete waterproofing of the façade. In addition to protecting the structure, this sealing work contributes to energy efficiency by reducing heat loss, in accordance with plans by Lemay, ABCP architectes, and the structural engineering firm.

Complete Replacement of the Concrete Cladding


We installed lightweight GFRC (Glass Fiber Reinforced Concrete) panels. Each one was securely attached to the structure using over 10,000 anchors drilled directly into the concrete. These anchors supported the vertical load and prevented any lateral movement.

To facilitate installation, we used a hoist specifically adapted to the constraints of the site. This custom system allowed us to safely lift the panels while the team coordinated their positioning with precision.

The team worked in full coordination, with the hoist lifting the panels from the ground and setting them precisely in their intended locations. Operators stationed on Fraco mast-climbing platforms monitored and guided the hoist throughout the operation. This method ensured a smooth workflow despite the complexity of the task.

We fully redid the caulking joints between the panels to ensure complete waterproofing of the façade. In addition to protecting the structure, this sealing work contributes to energy efficiency by reducing heat loss, in accordance with plans by Lemay, ABCP architectes, and the structural engineering firm.
Reinforced Expertise

Join our Winning Team

We provide a rich, open, responsive, and close-knit work environment. As an employer, we foster strong team spirit and treat our people with respect and consideration.

News
Media Appearances
Community Involvement
News about our team, achievements, and community involvement. Our work stands the test of time, and we are constantly striving to become even better.
News
Media Appearances
Community Involvement

News about our team, achievements, and community involvement. Our work stands the test of time, and we are constantly striving to become even better.