Parking Garage Repairs

With the consultant engineer’s recommandations, we conducted visual evaluation to identify extents of concrete deterioration/damage and waterproofing coating condition. We identified priority repair options.

The base of some columns needed to be reinforced. Our team demolished the areas that showed signs of degradation to clean up the area, before forming and pouring new concrete.

The rebars in some slab sections and columns were deteriorating. We replaced them.

After some concrete slabs were demolished and repaired. The concrete surfaces were protected with a car park & traffic protective sealer.

Parking Garage Repairs


With the consultant engineer’s recommandations, we conducted visual evaluation to identify extents of concrete deterioration/damage and waterproofing coating condition. We identified priority repair options.

The base of some columns needed to be reinforced. Our team demolished the areas that showed signs of degradation to clean up the area, before forming and pouring new concrete.

The rebars in some slab sections and columns were deteriorating. We replaced them.

After some concrete slabs were demolished and repaired. The concrete surfaces were protected with a car park & traffic protective sealer.
Meeting the Client's Needs

Join our Winning Team

We provide a rich, open, responsive, and close-knit work environment. As an employer, we foster strong team spirit and treat our people with respect and consideration.

News
Media Appearances
Community Involvement
News about our team, achievements, and community involvement. Our work stands the test of time, and we are constantly striving to become even better.
News
Media Appearances
Community Involvement

News about our team, achievements, and community involvement. Our work stands the test of time, and we are constantly striving to become even better.